Projects
3rd and 4th Quarter of 2010
1 - Project and execution of alterations of an existing MSB of 4000A from a mineral concentrate production Line at Somincor Mine in Portugal.
2 - Project and building of a new 6300A/100KA MSB.
(See pictures of work performed - Photos from Somincor Mine)
2nd Trimestre 2010
Off-shore work done in an oil field area for State owned Sonangol. Gestene was responsable for an extensive work of improvements, tests, calibrations ans Tests Reporting of a MV Terasaki Switchboard.
(See pictures of work performed - Photos from Sonangol)
2nd Trimestre 2009
1 - Maintenance work and alteration improvements on Protection equipment from the MSB and ESB.
2 - Technical assistence oh the Main Generator AVR's and replacement of phase detectors. Final testing with generators on load.
3 - Repairs and technical assistence on the vessels Terasaki automatic monitoring system.Off-shore work done in an oil field area for State owned Sonangol. Gestene was responsable for an extensive work of improvements, tests, calibrations ans Tests Reporting of a MV Terasaki Switchboard.
(See pictures of work performed - Photos from Vegaland)
1st Trimester 2008
Work done on Reefer Ship in pertnership with an English marine company, having dry docked in 2008 for a complete renovation of the electrical system, introducing a new 725 KVA power pack container, including the power fire detéction and alarm system, navigation system and comunication system, amongst other general required jobs.
(See pictures of work performed - Photos from Ice Field)
1st Trimester 2007
This project consisted of the replacement and functional improvements in the Power Management System of a Oceonographic Research Vessel, with 4 Generators 600KW each.
(See pictures of work performed - Photos from MV Gago Coutinho)