Projects

 

3rd and 4th Quarter of 2010

1 - Project and execution of alterations of an existing MSB of 4000A from a mineral concentrate production Line at Somincor Mine in Portugal.

2 - Project and building of a new 6300A/100KA MSB.

 (See pictures of work performed - Photos from Somincor Mine)

 2nd Trimestre 2010 

 Off-shore work done in an oil field area for State owned Sonangol. Gestene was responsable for an extensive work of improvements, tests, calibrations ans Tests Reporting of a MV Terasaki Switchboard.

  (See pictures of work performed - Photos from Sonangol)  

 

 2nd Trimestre 2009 

 1 - Maintenance work and alteration improvements on Protection equipment from the MSB and ESB.

2 - Technical assistence oh the Main Generator AVR's and replacement of phase detectors. Final testing with generators on load.

3 - Repairs and technical assistence on the vessels Terasaki automatic monitoring system.Off-shore work done in an oil field area for State owned Sonangol. Gestene was responsable for an extensive work of improvements, tests, calibrations ans Tests Reporting of a MV Terasaki Switchboard.

  (See pictures of work performed - Photos from Vegaland)   

 

 1st Trimester 2008 

 Work done on Reefer Ship in pertnership with an English marine company, having dry docked in 2008 for a complete renovation of the electrical system, introducing a new 725 KVA power pack container, including the power fire detéction and alarm system, navigation system and comunication system, amongst other general required jobs.

 (See pictures of work performed - Photos from Ice Field)   

 

1st Trimester 2007

This project consisted of the replacement and functional improvements in the Power Management System of a Oceonographic Research Vessel, with 4 Generators 600KW each.

 (See pictures of work performed - Photos from MV Gago Coutinho)  

     

 

 

 